The new Bina Yangın Yönetmeliği was published in Official Gazette No. 33443 under Presidential Decision No. 12041. It will enter into force on 1 January 2028, when the 2007 Binaların Yangından Korunması Hakkında Yönetmelik will be repealed.
What was published?
The new regulation reorganises fire safety across design, construction, operation, maintenance, inspection and emergency preparedness. It introduces clearer provisions for periodic building-level fire-safety controls, fire-safety reports, EV charging systems, building-integrated solar power systems and communication of certain fire alarm panels with the 112 Emergency Call Centre.
Publication date is not the effective date
Although the regulation was published on 27 November 2026, Article 147 sets its effective date as 1 January 2028. The existing 2007 regulation therefore remains the operative framework until the new regulation enters into force.
Publication of the new regulation does not mean every existing building must immediately be retrofitted to every new-building requirement. Existing buildings are governed by a specific transition regime under Article 141.
How existing buildings are treated
Article 141 provides that existing buildings which already comply with the 2007 regulation generally will not be required to adopt additional measures, except for the specific duties listed in paragraphs 3, 4 and 5. Where deficiencies are identified or major renovation takes place, the repealed 2007 technical provisions may still be applied in certain existing buildings, provided the new specific requirements are met. Buildings where hazardous materials are kept are treated more strictly and must comply with the new regulation.
2007 regulation vs 2026 regulation
| Topic | 2007 framework | 2026 framework |
|---|---|---|
| Effective regime | Current framework until end of 2027. | Enters into force on 1 Jan 2028. |
| Existing buildings already compliant | Existing-building chapter contained detailed special rules. | 2007-compliant buildings generally keep that status, subject to three explicit new areas. |
| High residential buildings | Existing-building requirements addressed escape and protection through the old special chapter. | Existing residential buildings over 30.50 m must have automatic fire detection/alarm and portable extinguishers. |
| EV charging | No equivalent dedicated existing-building EV charging regime. | Existing buildings with installed or planned EV charging must follow the specific Article 60 requirements. |
| Building-integrated PV | No equivalent detailed existing-building PV chapter. | Access, emergency isolation, layout documentation and warning signage become explicit requirements. |
| Periodic building control | Periodic testing and maintenance of systems were already required. | Building-level periodic control, fire-safety reports and a fire-safety-expert mechanism are more explicitly structured. |
Three key areas for existing buildings
1. Residential buildings over 30.50 m
Automatic fire detection and warning systems, plus appropriately located portable extinguishers, are expressly required.
2. EV charging systems
Existing car parks with installed or planned EV charging points need to be reviewed against the new technical and emergency-isolation provisions.
3. Building-integrated solar PV
Emergency isolation, access, layout drawings, cable routes and warning signs become part of the fire-safety assessment.
Transitional Article 4 gives existing buildings subject to these requirements one year from the regulation’s effective date to implement the measures.
Periodic control, reports and 112 integration
The new regulation creates a more explicit system of periodic building fire-safety control and current fire-safety reports. The detailed scope, frequency, fees and qualifications of fire-safety experts will be further regulated by the Ministry. It also establishes a framework for automatic communication between certain fire alarm control panels and the 112 Emergency Call Centre, with implementation details to be set by the relevant ministries.
What building owners and managers should do now
- Compile permits, occupancy documents, fire projects, inspection reports and maintenance records.
- Confirm current compliance under the 2007 regulation.
- Identify residential buildings above 30.50 m.
- Inventory all EV charging installations and home-socket charging practices.
- Document PV layout, emergency isolation points, inverter locations and cable routes.
- Include likely retrofit costs in the 2027 capital plan rather than waiting for 2028.
- Track the Ministry’s secondary regulations on periodic controls and fire-safety experts.
Official sources
- 2026 Building Fire Regulation – Official Gazette ↗
- 2007 Buildings Fire Protection Regulation – Official Gazette ↗
This article is a technical overview, not legal advice or a building-specific fire design. Building classification, permit dates, height, use, existing systems and local authority practice must be reviewed for each case.